LeNoir Hall

Columbus State University
urban-gro | Projects - LeNoir Hall at Columbus State University

urban-gro | Projects - LeNoir Hall at Columbus State University

urban-gro | Projects - LeNoir Hall at Columbus State University

urban-gro | Projects - LeNoir Hall at Columbus State University

urban-gro | Projects - LeNoir Hall at Columbus State University

urban-gro | Projects - LeNoir Hall at Columbus State University

urban-gro | Projects - LeNoir Hall at Columbus State University

urban-gro | Projects - LeNoir Hall at Columbus State University

urban-gro | Projects - LeNoir Hall at Columbus State University

urban-gro | Projects - LeNoir Hall at Columbus State University

urban-gro | Projects - LeNoir Hall at Columbus State University

urban-gro | Projects - LeNoir Hall at Columbus State University

Since the original construction of LeNoir Hall in 1988, the science programs at Columbus State University grew steadily. The building of about 71,000 square feet was outgrown and outdated as the college’s programs expanded. By 2016, they were in need of more space, newer teaching technology, and greater flexibility for future growth.

The collaborative design team of 2WR and Lord Aeck Sargent (LAS) worked closely with both faculty and students to program a new addition of 22,500 sf and extensively renovate nearly a third of the existing building. The new work adds 8 new laboratories, renovates existing labs for research use, and provides collaborative study and presentation space. Through the BOR and GSFIC process, the design team intensively studied the science programs and optimized the $11.1 million construction budget to provide the most useful space for the university.

While complimenting the style and proportion of the original brick building, the new addition distinguishes itself with metal panels and large windows. Inviting study spaces with views onto the heart of the campus put science on display and enable all students to connect with the activities inside the building. New laboratories designed for inter-discipline flexibility feature the latest equipment and furnishings. Informal meeting spaces and study rooms encourage collaborative study and foster a sense of community between all the science departments.

The design challenges include working on a limited site with a steep slope, integrating new systems and partially replacing existing systems, and phasing the intervention to keep the building operational during construction.

Markets

Services

FEATURED PROJECTS

Let urban-gro build your path forward

University of Houston Club House
projects

University of Houston Club House

Our engineering team consulted on this 20,000 square foot university clubhouse. This new...

Howard Hall at Columbus State University
projects

Howard Hall at Columbus State University

The most heavily used classroom building on Columbus State University’s main campus, Howard Hall is...

LeNoir Hall
projects

LeNoir Hall

Since the original construction of LeNoir Hall in 1988, the science programs at Columbus State...

higher-ed-cta-bush

Ready to Start Your Project?

Experience a simplified turnkey design process from concept to projection completion when speed to market matters.

Reach Out