https://www.urban-gro.com/hubfs/_Website%20Assets%202023/Compressed%20Images/janddimages-120318-3002_1.webp

LeNoir Hall

Columbus, Georgia
janddimages-120318-3001 (1)
urban-gro | Projects - LeNoir Hall at Columbus State University
urban-gro | Projects - LeNoir Hall at Columbus State University
urban-gro | Projects - LeNoir Hall at Columbus State University
urban-gro | Projects - LeNoir Hall at Columbus State University
urban-gro | Projects - LeNoir Hall at Columbus State University

Since the original construction of LeNoir Hall in 1988, the science programs at Columbus State University grew steadily. The building of about 71,000 square feet was outgrown and outdated as the college’s programs expanded. By 2016, they were in need of more space, newer teaching technology, and greater flexibility for future growth.

Our team collaborated on the design with Lord Aeck Sargent (LAS) and  worked closely with both faculty and students to program a new addition of 22,500 sf and extensively renovate nearly a third of the existing building. The new work adds 8 new laboratories, renovates existing labs for research use, and provides collaborative study and presentation space. Through the BOR and GSFIC process, the design team intensively studied the science programs and optimized the $11.1 million construction budget to provide the most useful space for the university.

While complimenting the style and proportion of the original brick building, the new addition distinguishes itself with metal panels and large windows. Inviting study spaces with views onto the heart of the campus put science on display and enable all students to connect with the activities inside the building. New laboratories designed for inter-discipline flexibility feature the latest equipment and furnishings. Informal meeting spaces and study rooms encourage collaborative study and foster a sense of community between all the science departments.

The design challenges include working on a limited site with a steep slope, integrating new systems and partially replacing existing systems, and phasing the intervention to keep the building operational during construction.

Markets

Services

FEATURED PROJECTS

Let urban-gro build your path forward

projects

Rosalynn Carter Health & Human Sciences Center

Comprised of several individual program buildings, this complex was designed to mesh with the rest...

projects

Roberts Library

As a multi-building renovation project, the mid-century modern Roberts Library was renovated for...

projects

Charles H. Kirbo Center

Originally developed by another firm, our design team took over the existing 33,000 square foot...

higher-ed-cta-bush

Ready to Start Your Project?

Experience a simplified turnkey design process from concept to projection completion when speed to market matters.

Reach Out